keywords: Communication connection between battery and hybrid inverter.
NOTE:
SHRT inverter series is compatible with SBRxxx .
SHT inverter series is compatible with SBRxxx and SBHxxx.
If the BMS communication to the hybrid inverter is abnormal, the Error Code 714 will be shown.
BATTERIES
HYBRID INVERTERS
SHxxRT BMS/CAN communication ports
SHxxRS BMS/CAN communication ports
SHxxT BMS/CAN communication ports:
The SHxxT series can be used with the SBRxxx as well as the SBHxxx series. Thus, two possible methodologies for Battery communication are given:
Method One: RS485 communication cable:
Method Two: RJ45 communication cable:
Communication connection:
The first two pins of the RS485 cable on the battery side are connected to the CAN H and CAN L of the inverter.
SBR Battery COMM | SHxxRT BMS/CAN |
Orange-white CAN H | pin 5 (H) |
Orange CAN L | pin 7 (L) |
SBR Battery COMM | SHxxRS BMS/CAN |
Orange-white CAN H | pin 2 (H) |
Orange CAN L | pin 4 (L) |
SBR Battery COMM | SHxxT BMS/CAN |
Orange-white CAN H | pin 22 (H) |
Orange CAN L | pin 21 (L) |
SBH Battery COMM | SHxxT BMS/CAN (RJ45) |
Orange-white CAN H & Orange CAN L | RJ45 BAT |