Skip to main content
Can I realize feed-in limitation without an energy meter?
Updated over a week ago

keywords: electricity meter, electric meter, electrical meter, energy meter, or kilowatt-hour meter, dynamic power limitation, what do i need to set dynamic power limitation?

Answer:

No, an energy meter is needed to be able to read the loads, deliver energy to these loads and not exceed the defined grid feed-in limitation.

Did this answer your question?