Skip to main content
Battery calibration method of SBR/SBH battery modules

Applicable for SBR &SBH Batteries

Updated over a week ago

Through iSolarCloud website: remote setting

Two calibration methods are recommended for SBR battery module:

  1. After logging with your account, select on the left bar "Settings", and then inside this tab, select the plant and click on "Common Parameter Settings". Note that the Initial Grid should have been Already set.

    Fig.1

  2. Inside the "Energy Management Parameters" tab, Compose a 3-module system and carry out "forced charging" through inverter to 100%.

    Fig.2.

  3. To finalize and confirm these adjustments, remember to apply the settings.

Note: In the future the hybrid inverters will support charging and discharging the single battery module, and the launch time of this feature will be notified soon.


For further information, please download the manufacturer declaration here and the user manual here. (modify link to SHT user manual when available)

This manual is intended for professional technicians who are responsible for installation, operation, maintenance and troubleshooting of inverters, and users who need to check inverter parameters. The inverter must only be installed by professional technicians.

The professional technician is required to meet the following requirements:

  • Know electronic, electrical wiring and mechanical expertise, and be familiar with electrical and mechanical schematics.

  • Have received professional training related to the installation, commissioning and troubleshooting of electrical equipment.

  • Be able to quickly respond to hazards or emergencies that occur during installation, commissioning and troubleshooting.

  • Be familiar with local standards and relevant safety regulations of electrical systems.

  • Read this manual thoroughly and understand the safety instructions related to operations.

Did this answer your question?